Sure-Way Faciltiy
Date: 08/18/2005
Ventilation Area
Date: 08/18/2005
Industrial Area
Date: 08/18/2005
170-Ton Allsteel Hydraulic Brake
Date: 08/18/2005
90-Ton Iron Worker
Date: 08/18/2005
Horizontal Structural Saw
Date: 08/18/2005
70-Ton Allsteel
Date: 08/18/2005
Lockformers
Date: 07/05/2005
Plate Roller
Date: 07/05/2005
High Definition Plasma
Date: 07/05/2005
Regular Plasma
Date: 08/18/2005
Rear View Plant
Date: 07/01/2005
Truck Loaded - Rear
Date: 07/01/2005
Precision Leveling Frame
Date: 08/18/2005
Date: 07/05/2005
Scan0006.jpg
14-Gauge Heater Box
Date: 08/18/2005
Heater Box
Date: 08/18/2005
Loading Heater Box
Date: 08/18/2005
Loading Heater Box
Date: 08/18/2005
Alcan Equipment Connection.jpg
Alcan Equipment Connection.jpg
Date: 08/19/2005
alcan equiptment connection
TTC Greenwood Terminal ~ Dust Collection System for Maintenance Yard
Date: 08/18/2005
Scan0021.jpg
TTC Greenwood Terminal ~ Dust Collection System for Maintenance Yard
Date: 08/18/2005
Dust Collection Elbows Fabricated for Teflon Removable Wear Plates
Date: 08/18/2005
Dust Collection Elbows Fabricated For Teflon Removable Wear Plates
Date: 08/18/2005
Mini Dust Collector Cyclone and Drop Out Boxes
Date: 08/18/2005
Paper Pick-up Fabricated Cyclone c/w Support Frame
Date: 08/18/2005
Stainless Lab Exhaust
Date: 08/18/2005
3/16 Stainless Steel flat oval lab exhaust ~ exposed in classroom
Stainless Lab Exhaust
Date: 08/18/2005
3/16 Stainless Steel flat oval lab exhaust ~ exposed in classroom
Stainless Lab Exhaust
Date: 08/18/2005
3/16 Stainless Steel flat oval lab exhaust ~ exposed in classroom
BurnPlug ~ Fabricated from 253 MA Stainless Steel
Date: 07/05/2005
Incinerator Burner Parts - Burner Cone
Date: 08/18/2005
Incinerator Burner Parts - Burner Cone
Date: 08/18/2005
High Temperature Compensators
Date: 07/05/2005
Fabricated from Heavy Welded Steel. Outer Fabric Two Layers 1" standoff Pack With KO wool - Inner Steel Liner for Protection
High Temperature Compensators
Scan0029.jpg
Date: 07/05/2005
Fabricated from Heavy Welded Steel. Outer Fabric Two Layers 1" standoff Pack With KO wool - Inner Steel Liner for Protection
Stainless Steel Expansion Joints
Date: 08/18/2005
Stainless Steel Expansion Joints
Date: 08/18/2005
Stainless Steel Expansion Joints
Date: 08/18/2005
Damper
Date: 07/05/2005
Fabricated from Heavy Steel, Fully welded and complete with bearings, heat isolated
Damper
Date: 07/05/2005
Fabricated from Heavy Steel, Fully welded and complete with bearings, heat isolated
High Temperature Nozzle Blower Ducts
Date: 07/05/2005
10,000 CFM 1200 degrees Air Requirment for Mining Project
Hudson's Bay
High Temperature Nozzle Blower Ducts
Date: 07/05/2005
10,000 CFM 1200 degrees Air Requirment for Mining Project
Hudson's Bay
High Temperature Nozzle Blower Ducts
Date: 07/05/2005
10,000 CFM 1200 degrees Air Requirment for Mining Project
Hudson's Bay
High Temperature Tee Damper
Date: 07/05/2005
Exclusively used in the printing industry,
Isolated Shaft Bearings and Special Blade Gaskets
High Temperature Tee Damper
Date: 07/05/2005
Exclusively used in the printing industry,
Isolated Shaft Bearings and Special Blade Gaskets
High Temperature Tee Damper
Date: 07/05/2005
Exclusively used in the printing industry,
Isolated Shaft Bearings and Special Blade Gaskets
High Temperature Duct Work
150 PSI Flanged Connections
Date: 07/05/2005
Project: Markham District Energy Co-Gen installation
High Temperature Duct Work
150 PSI Flanged Connections
Date: 07/05/2005
High Temperature Duct Work
150 PSI Flanged Connections
Date: 07/05/2005
Oven Panels and Ductwork - Temperature Rating 1200 Degrees F
Date: 08/18/2005
Aluminized & SS Innter Skind. Sation coat outer skin, Tongue and Groove constuction 6" Roxul insulation
2x2 1/8 inner grids c/w 3/16 Rod Thermal break stand offs and supports.
Oven Panels and Ductwork - Temperature Rating 1200 Degrees F
Date: 08/18/2005
Aluminized & SS Innter Skind. Sation coat outer skin, Tongue and Groove constuction 6" Roxul insulation
2x2 1/8 inner grids c/w 3/16 Rod Thermal break stand offs and supports.
Oven Panels and Ductwork - Temperature Rating 1200 Degrees F
Date: 08/18/2005
Aluminized & SS Innter Skind. Sation coat outer skin, Tongue and Groove constuction 6" Roxul insulation
2x2 1/8 inner grids c/w 3/16 Rod Thermal break stand offs and supports.
Custom Built Stainless Steel Gas Burner Section
Date: 08/18/2005
Tee Damper
Date: 07/05/2005
Insulated Duct
Date: 07/05/2005
A.W.S Inc. Install Quebecor, Concord
Date: 08/18/2005
A.W.S Incinerator Install
aws incinerator install
Date: 08/18/2005
Quebecor, Richmond Hill - KATECS
QUE RH KATECS
Date: 08/18/2005
Lawson L&E
Date: 08/18/2005
Alcan Site Installation
Date: 08/24/2005
Lawson Ceruti Press
Date: 08/18/2005
Lawson Ceruti Press
Date: 08/18/2005
Lawson Ceruti Press
Date: 08/18/2005
In Plant Fabrication for Alcan
Date: 08/18/2005
In Plant Fabrication for Alcan
Date: 08/18/2005
96" Diameter for Alcan
Date: 08/18/2005
80 IN. DUCTS FOR ALCAN
Date: 07/05/2005
Alcan Roof Connections
Date: 08/18/2005
Alcan Site Installation
Date: 08/24/2005
SHOP FAB.FOR ALCAN
Date: 07/05/2005
CS QUE CON,
Date: 07/05/2005
CS ST. JOES
Date: 07/05/2005
CS YORKVILLE G
Date: 07/05/2005
CS YORKVILLE
Date: 07/05/2005
law view.jpg
law view.jpg
Date: 07/05/2005
law view.jpg
scan0018.jpg
scan0018.jpg
Date: 07/05/2005
scan0018.jpg
Christies Bakery ~ Total Oven Rebuild ~ 10days Christmas Shutdown
Date: 07/05/2005
Christies Bakery ~ Total Oven Rebuild ~ 10days Christmas Shutdown
Date: 07/05/2005
Christies Bakery ~ Total Oven Rebuild ~ 10days Christmas Shutdown
Date: 07/05/2005
Web Press Printing Oven rebuild
Date: 07/05/2005
Complete strip down all S/S inner connections
Replaced and refurbished all re-skinned painted and re-installed for Transcontinental Printing
Web Press Printing Oven rebuild
Date: 07/05/2005
Complete strip down all S/S inner connections
Replaced and refurbished all re-skinned painted and re-installed for Transcontinental Printing
Web Press Printing Oven rebuild
Scan0055.jpg
Date: 07/05/2005
Complete strip down all S/S inner connections
Replaced and refurbished all re-skinned painted and re-installed for Transcontinental Printing
Refractory Lined Stack
Date: 08/19/2005
Polished Stack
Date: 08/19/2005
Accoustic Stack Cap
Date: 08/19/2005
High Temperature Stack Fabrication
Date: 08/19/2005
Stack and Crane
Date: 08/19/2005
150 ft Stack Liner Installation
Date: 08/19/2005
Stack Installation
Date: 08/19/2005
Stack Erection
Date: 08/19/2005
Stack Installation
Date: 08/19/2005
Stack Installation
Date: 08/19/2005
Stack Installation
Date: 08/19/2005
Stack Sections for Shipment
Date: 08/19/2005
Stack Roof Connection
Date: 08/19/2005
Stack Installation - Markham District Energy
Date: 08/19/2005
Stack Installation - Markham District Energy
Date: 08/19/2005
Stack Installation - Markham District Energy
Date: 08/19/2005
Stack Installation - Queen's Park
Date: 08/19/2005
Weather Proof Stack
Date: 08/19/2005
Alcan Installation
Date: 08/19/2005
Alcan Installation
Date: 08/19/2005
Apotex - Stainless Steel Platform complete with stairs and railing
Date: 07/05/2005
all polished material
Date: 07/05/2005
fordon, Page 40.jpg
Work bench
Date: 07/05/2005
Work Station
Date: 07/05/2005
Truck Cab
Date: 07/05/2005
Truck Cab
Date: 07/05/2005
Truck Cab
Date: 07/05/2005
Truck Cab
Date: 07/05/2005