Home,  About us, Contact us, Services, Plant Capabilities,                Industrial, Commercial, Custom Manufacturing, Pollution Control

Sure-Way Faciltiy Date: 08/18/2005
Ventilation Area Date: 08/18/2005
Industrial Area Date: 08/18/2005
170-Ton Allsteel Hydraulic Brake Date: 08/18/2005
90-Ton Iron Worker Date: 08/18/2005
Horizontal Structural Saw Date: 08/18/2005
70-Ton Allsteel Date: 08/18/2005
Lockformers Date: 07/05/2005
Plate Roller Date: 07/05/2005
High Definition Plasma Date: 07/05/2005
Regular Plasma Date: 08/18/2005
Rear View Plant Date: 07/01/2005
Truck Loaded - Rear Date: 07/01/2005
Precision Leveling Frame Date: 08/18/2005
Date: 07/05/2005
Date: 07/05/2005 Scan0006.jpg
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/26/2005
14-Gauge Heater Box Date: 08/18/2005
Heater Box Date: 08/18/2005
Loading Heater Box Date: 08/18/2005
Loading Heater Box Date: 08/18/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Alcan Equipment Connection.jpg Alcan Equipment Connection.jpg Date: 08/19/2005 alcan equiptment connection
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
TTC Greenwood Terminal ~ Dust Collection System for Maintenance Yard Date: 08/18/2005 Scan0021.jpg
TTC Greenwood Terminal ~ Dust Collection System for Maintenance Yard Date: 08/18/2005
Dust Collection Elbows Fabricated for Teflon Removable Wear Plates Date: 08/18/2005
Dust Collection Elbows Fabricated For Teflon Removable Wear Plates Date: 08/18/2005
Mini Dust Collector Cyclone and Drop Out Boxes Date: 08/18/2005
Paper Pick-up Fabricated Cyclone c/w Support Frame Date: 08/18/2005
Date: 07/07/2005
Date: 07/07/2005
Date: 07/07/2005
Date: 07/07/2005
Date: 07/07/2005
Date: 07/07/2005
Date: 07/07/2005
Date: 07/07/2005
Date: 07/07/2005
Date: 07/07/2005
Date: 07/05/2005
Date: 07/05/2005
Stainless Lab Exhaust Date: 08/18/2005 3/16 Stainless Steel flat oval lab exhaust ~ exposed in classroom
Stainless Lab Exhaust Date: 08/18/2005 3/16 Stainless Steel flat oval lab exhaust ~ exposed in classroom
Stainless Lab Exhaust Date: 08/18/2005 3/16 Stainless Steel flat oval lab exhaust ~ exposed in classroom
BurnPlug ~ Fabricated from 253 MA Stainless Steel Date: 07/05/2005
Incinerator Burner Parts - Burner Cone Date: 08/18/2005
Incinerator Burner Parts - Burner Cone Date: 08/18/2005
High Temperature Compensators Date: 07/05/2005 Fabricated from Heavy Welded Steel. Outer Fabric Two Layers 1" standoff Pack With KO wool - Inner Steel Liner for Protection
Date: 07/05/2005
High Temperature Compensators Scan0029.jpg Date: 07/05/2005 Fabricated from Heavy Welded Steel. Outer Fabric Two Layers 1" standoff Pack With KO wool - Inner Steel Liner for Protection
Stainless Steel Expansion Joints Date: 08/18/2005
Stainless Steel Expansion Joints Date: 08/18/2005
Stainless Steel Expansion Joints Date: 08/18/2005
Damper Date: 07/05/2005 Fabricated from Heavy Steel, Fully welded and complete with bearings, heat isolated
Damper Date: 07/05/2005 Fabricated from Heavy Steel, Fully welded and complete with bearings, heat isolated
High Temperature Nozzle Blower Ducts Date: 07/05/2005 10,000 CFM 1200 degrees Air Requirment for Mining Project
Hudson's Bay
High Temperature Nozzle Blower Ducts Date: 07/05/2005 10,000 CFM 1200 degrees Air Requirment for Mining Project
Hudson's Bay
High Temperature Nozzle Blower Ducts Date: 07/05/2005 10,000 CFM 1200 degrees Air Requirment for Mining Project
Hudson's Bay
High Temperature Tee Damper Date: 07/05/2005 Exclusively used in the printing industry,

Isolated Shaft Bearings and Special Blade Gaskets
High Temperature Tee Damper Date: 07/05/2005 Exclusively used in the printing industry,

Isolated Shaft Bearings and Special Blade Gaskets
High Temperature Tee Damper Date: 07/05/2005 Exclusively used in the printing industry,

Isolated Shaft Bearings and Special Blade Gaskets
High Temperature Duct Work 150 PSI Flanged Connections Date: 07/05/2005 Project: Markham District Energy Co-Gen installation
High Temperature Duct Work 150 PSI Flanged Connections Date: 07/05/2005
High Temperature Duct Work 150 PSI Flanged Connections Date: 07/05/2005
Oven Panels and Ductwork - Temperature Rating 1200 Degrees F Date: 08/18/2005 Aluminized & SS Innter Skind. Sation coat outer skin, Tongue and Groove constuction 6" Roxul insulation
2x2 1/8 inner grids c/w 3/16 Rod Thermal break stand offs and supports.
Oven Panels and Ductwork - Temperature Rating 1200 Degrees F Date: 08/18/2005 Aluminized & SS Innter Skind. Sation coat outer skin, Tongue and Groove constuction 6" Roxul insulation
2x2 1/8 inner grids c/w 3/16 Rod Thermal break stand offs and supports.
Oven Panels and Ductwork - Temperature Rating 1200 Degrees F Date: 08/18/2005 Aluminized & SS Innter Skind. Sation coat outer skin, Tongue and Groove constuction 6" Roxul insulation
2x2 1/8 inner grids c/w 3/16 Rod Thermal break stand offs and supports.
Custom Built Stainless Steel Gas Burner Section Date: 08/18/2005
Tee Damper Date: 07/05/2005
Insulated Duct Date: 07/05/2005
Date: 07/05/2005
A.W.S Inc. Install Quebecor, Concord Date: 08/18/2005
A.W.S Incinerator Install aws incinerator install Date: 08/18/2005
Quebecor, Richmond Hill - KATECS QUE RH KATECS Date: 08/18/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
ALCAN Date: 08/18/2005
Lawson L&E Date: 08/18/2005
ALCAN Date: 08/18/2005
ALCAN Date: 08/18/2005
ALCAN Date: 08/18/2005
Alcan Site Installation Date: 08/24/2005
Lawson Ceruti Press Date: 08/18/2005
Lawson Ceruti Press Date: 08/18/2005
Lawson Ceruti Press Date: 08/18/2005
In Plant Fabrication for Alcan Date: 08/18/2005
In Plant Fabrication for Alcan Date: 08/18/2005
96" Diameter for Alcan Date: 08/18/2005
80 IN. DUCTS FOR ALCAN Date: 07/05/2005
Alcan Roof Connections Date: 08/18/2005
Alcan Site Installation Date: 08/24/2005
SHOP FAB.FOR ALCAN Date: 07/05/2005
Date: 07/05/2005
CS QUE CON, Date: 07/05/2005
CS ST. JOES Date: 07/05/2005
CS YORKVILLE G Date: 07/05/2005
CS YORKVILLE Date: 07/05/2005
law view.jpg law view.jpg Date: 07/05/2005 law view.jpg
Date: 07/05/2005
Date: 07/13/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
scan0018.jpg scan0018.jpg Date: 07/05/2005 scan0018.jpg
Christies Bakery ~ Total Oven Rebuild ~ 10days Christmas Shutdown Date: 07/05/2005
Christies Bakery ~ Total Oven Rebuild ~ 10days Christmas Shutdown Date: 07/05/2005
Christies Bakery ~ Total Oven Rebuild ~ 10days Christmas Shutdown Date: 07/05/2005
Web Press Printing Oven rebuild Date: 07/05/2005 Complete strip down all S/S inner connections
Replaced and refurbished all re-skinned painted and re-installed for Transcontinental Printing
Web Press Printing Oven rebuild Date: 07/05/2005 Complete strip down all S/S inner connections
Replaced and refurbished all re-skinned painted and re-installed for Transcontinental Printing
Web Press Printing Oven rebuild Scan0055.jpg Date: 07/05/2005 Complete strip down all S/S inner connections
Replaced and refurbished all re-skinned painted and re-installed for Transcontinental Printing
Refractory Lined Stack Date: 08/19/2005
Polished Stack Date: 08/19/2005
Accoustic Stack Cap Date: 08/19/2005
High Temperature Stack Fabrication Date: 08/19/2005
Stack and Crane Date: 08/19/2005
150 ft Stack Liner Installation Date: 08/19/2005
Stack Installation Date: 08/19/2005
Stack Erection Date: 08/19/2005
Stack Installation Date: 08/19/2005
Stack Installation Date: 08/19/2005
Stack Installation Date: 08/19/2005
Stack Sections for Shipment Date: 08/19/2005
Stack Roof Connection Date: 08/19/2005
Date: 07/05/2005
Date: 07/05/2005
Stack Installation - Markham District Energy Date: 08/19/2005
Stack Installation - Markham District Energy Date: 08/19/2005
Stack Installation - Markham District Energy Date: 08/19/2005
Stack Installation - Queen's Park Date: 08/19/2005
Weather Proof Stack Date: 08/19/2005
Alcan Installation Date: 08/19/2005
Alcan Installation Date: 08/19/2005
Apotex - Stainless Steel Platform complete with stairs and railing Date: 07/05/2005 all polished material
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005 fordon, Page 40.jpg
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/05/2005
Date: 07/08/2005
Date: 07/08/2005
Date: 07/08/2005
Date: 07/06/2005
Date: 07/06/2005
Date: 07/06/2005
Date: 07/13/2005
Date: 07/06/2005
Date: 07/06/2005
Date: 07/06/2005
Work bench Date: 07/05/2005
Cabinet Date: 07/05/2005
Work Station Date: 07/05/2005
Cabinet Date: 07/05/2005
Truck Cab Date: 07/05/2005
Truck Cab Date: 07/05/2005
Truck Cab Date: 07/05/2005
Truck Cab Date: 07/05/2005
[-]
Stop   Pause   Back One Image   Show More Info   delay:   direction:   max size:  
Gallery 2.0-beta-3